Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| report [2025/06/26 01:37] – [7.3 Concept] team4 | report [2025/07/01 13:51] (current) – [Abstract] team4 | ||
|---|---|---|---|
| Line 12: | Line 12: | ||
| ===== Abstract ===== | ===== Abstract ===== | ||
| + | The European Project Semester (EPS) is an innovative engineering capstone project semester. Currently, the programme is offered by 20 European universities, | ||
| + | During the semester, the team successfully designed, developed, and tested the AzuLoop prototype, while gaining valuable technical and personal skills through collaborative learning | ||
| ===== Glossary ===== | ===== Glossary ===== | ||
| <WRAP round box 400px> | <WRAP round box 400px> | ||
| Line 2143: | Line 2145: | ||
| \end{equation} | \end{equation} | ||
| - | **Energy saving by reutilizing water (Calculated with a water cleaning power usage of 2 kWh/m^3) = (0,002 kWh/L)** | + | **Energy saving by reutilizing water (Calculated with a water cleaning power usage of 2 kWh/ |
| \begin{equation} | \begin{equation} | ||
| - | P_cleaning | + | P_c = 0,002 kWh/L * 5 L = 0,01 kWh |
| \end{equation} | \end{equation} | ||